PSCO會(huì)開(kāi)具什么類型的壓載水缺陷

 踏雪無(wú)痕zmbk92 2017-10-09

自9月8日壓載水公約生效以來(lái),根據(jù)相關(guān)備忘錄發(fā)布的缺陷集,港口國(guó)檢查官開(kāi)具了一大批涉及壓載水公約的缺陷。主要集中在以下九個(gè)方面:

1、absence of an International Ballast Water Management Certificate(IBWMC)(壓載水管理證書不在船或缺失);

2、absence of a Ballast Water Management Plan(BWMP)(壓載水管理計(jì)劃不在船或缺失);

3、absence of a Ballast Water Record Book(BWRB)(壓載水排放記錄不在船或缺失);

4、indication that the ship or its equipment does not correspond substantially with the particulars of the IBWMC and BWMP(實(shí)際安裝的壓載水處理設(shè)備與壓載水管理計(jì)劃或壓載水證書上的不一致);

5、absence, serious deterioration or failure of proper operation of equipment required under the BWMP(壓載水管理計(jì)劃無(wú)操作程序);

6、the designated officers or crew are not familiar with essential ballast water management procedures including the operation of Ballast Water Management System(BWMS) and all associated BWMS equipment(主管船員不熟悉壓載水操作程序或設(shè)備等);

7、no ballast water management procedures have been implemented on board(船方未執(zhí)行壓載水操作程序);

8、no designated officer has been nominated(沒(méi)有指定操作人員);

9、the ship has not complied with the BWMP for management and treatment of ballast water(船上未按照壓載水管理計(jì)劃的要求處理壓載水);

10、ballast water has been discharged other than in accordance with the regulations of the BWM Convention (regulation A-2)(壓載水未按照壓載水公約A-2的要求處理壓載水). 


具體缺陷舉例:

USA15101Safety and  environmental policyVessel is  currently not following or documenting items in the ballast water management  plan including bio fouling.船上沒(méi)有按照壓載水管理計(jì)劃執(zhí)行
USA99100OtherVessel not  fitted with ballast water managemetn plan (BWMS) or USCG approved Alternate  Management System.船舶沒(méi)有安裝壓載水管理計(jì)劃要求的設(shè)備
USA99100OtherVessel failed  to submit the ballast water report within 6 hours. When arrived in Brunswick,  GA on 31 May 2017 2256 LT.船上沒(méi)有按時(shí)遞交壓載水報(bào)告
JAPAN15101Safety and   environmental policyBallast Water   Management procedures were not followed as 
 prescribed in Safety Management System.SMS體系中沒(méi)有壓載水管理程序的內(nèi)容
USA15101Safety   and environmental policyVessel   is restricted from discharging ballast water in U.S. until it complies with 33CFR 151 subpart D
RUSSIA13199Other  (machinery)Ballast water  pump - shaft seal leaking壓載水泵軸封漏水


CHINA03108Ventilators,  air pipes, casings

Top of air pipe for No.4 wing ballast water tank holed.NO.4號(hào)壓載艙透氣孔銹穿

USA15101Safety and  environmental policyVessel  currently is not following their ballast water management plan on the  bio-fouling plan crew was unable to find IMO resolution 865(20).船方未按照壓載水管理計(jì)劃執(zhí)行,船員找不到IMO865(20決議
JAPAN15101Safety and   environmental policy

Crew has not  been following their ballast water management plan. The vessel has been only   approved to do the sequential method as the only method of ballast water   exchange. Crew has been doing the flow through method since 23 Sep 2016.

船員未按照壓載水管理計(jì)劃處理壓載水

USA99100OtherVessel  has not employed one of the ballast water management methods in 33CFR151.2025(a).船方未按33CFR151.2025(a)要求制定壓載水管理辦法
USA99100Other

Vessel   discharged ballast water in Puget Sound without ensuring the ballast water   meets the standard

船方未按照要求處理壓載水.


缺陷很多,不一一列舉。美國(guó)、俄羅斯、日本發(fā)現(xiàn)的缺陷較多,中國(guó)由于沒(méi)有加入壓載水公約檢查相對(duì)薄弱。從缺陷分析壓載水相關(guān)的缺陷有不少是開(kāi)了體系缺陷或設(shè)備操作缺陷,這個(gè)需引起重視。盡管中國(guó)未加入壓載水公約,SMS中如果有相關(guān)的操作,中國(guó)PSCO一樣可以核查,一樣可以開(kāi)具缺陷。壓載水公約來(lái)了,預(yù)計(jì)涉及壓載水類的缺陷將會(huì)集中出現(xiàn),提醒相關(guān)方注意。